What You Get Inside the Toolkit
- A one-page 7 Checks sheet: a gate to run on every earthwork request before you recommend action.
- An Evidence Checklist so you ask for the same proof every time: geotechnical report criteria, specification sections, verification records, density and moisture tests, written technical direction, survey surfaces, measured quantities, and photographs. PDF plus editable Word.
- A Decision Tree that walks a live request through seven steps and ends in a yes, not yet, or no recommendation with the basis stated.
- Eight sample addendum clauses plus one optional, written for use before bidding: definition of unsuitable soils, measurement, proof-roll and rework sequence, remedy selection, lime stabilization, testing frequency, weather protection, haul and borrow, and records. Sample language that requires project-specific review. PDF plus editable Word.
- Phone and meeting scripts for four pressure points: the contractor wants a price approved now, the contractor resists rework and retest, the geotechnical engineer is vague or shifts the recommendation, and the owner or construction manager pushes to approve quickly. Includes a 15-minute alignment call agenda and a follow-up email frame.
- A Photo Angles guide so field photos capture what matters: limits, deflection, lift thickness, mixing depth, and protection.
- A Photo Log so every photograph is tied to the record. PDF plus editable Word.
- A recommended folder structure so the record is organized the same way on every project, from written direction to the final evidence packet.
- Start HerePDF
- 7 ChecksPDF
- Evidence ChecklistPDF + DOCX
- Decision TreePDF
- Addendum ClausesPDF + DOCX
- Phone and Meeting ScriptsPDF
- Photo Angles + Photo LogPDF + DOCX
Full file list
- 1.Start Here (PDF)
- 2.7 Checks (PDF)
- 3.Evidence Checklist (PDF)
- 4.Evidence Checklist (editable DOCX)
- 5.Decision Tree (PDF)
- 6.Addendum Clauses (PDF)
- 7.Addendum Clauses (editable DOCX)
- 8.Phone and Meeting Scripts (PDF)
- 9.Photo Angles (PDF)
- 10.Photo Log (PDF)
- 11.Photo Log (editable DOCX)
- 12.ReadMe and License (PDF)
- 13.Folder Structure (Markdown)
Why Earthwork Change Orders Get Expensive Fast
The claim arrives with a price attached and a crew standing by, before the condition has been verified against the geotechnical report.
The proof is thin: photos without scale, no dated record of who was present, limits never marked.
Quantities come from truck or stockpile counts when the contract calls for measured in-place work.
Direction is verbal, or the remedy shifts without anything in writing.
Every project manager responds differently, and without a record the conversation becomes opinion against opinion.
A Repeatable Evidence Workflow
Verify first. Price second. The toolkit runs every earthwork request through the same seven steps.
- 1
Verify the condition.
- 2
Document the result.
- 3
Rework and retest where the project requires it.
- 4
Obtain appropriate written technical direction.
- 5
Execute according to project requirements.
- 6
Verify quantities under the specified measurement method.
- 7
Assemble evidence and make a recommendation.
Use it as is, or adapt the three editable Word files (Evidence Checklist, Addendum Clauses, Photo Log) to match your firm's standards.
Defense means defending the decision. If the record supports the request, the recommendation is yes, and you can show why. If it does not, you can show that too.
Where This Came From
This toolkit came out of real projects. An earthwork subcontractor would hit less-than-perfect conditions and tell the general contractor it was a major issue that required a change order. Often, neither had fully followed the geotechnical report or the requirements repeated in the construction documents.
When the facts were raised, the conversation got defensive fast. What worked was staying with the facts, walking through the documents, asking the contractor for their records, and pointing to the contract obligations that had not been met.
This toolkit is that process, written down so your team can run it the same way every time.
Built For
For commercial projects, public or private.
- Architects and engineers reviewing contractor change requests
- Owner's reps who need defensible documentation
- Project managers and construction administrators coordinating field information, schedule pressure, and approvals
- Teams managing multiple projects who want consistency across project managers
Not ideal if you are looking for legal advice or a one-size-fits-all contract. This is a practical documentation and evaluation system focused on unsuitable soils and subgrade remedies.
How It Works
- Step 1
Complete secure checkout on Whop ($297).
- Step 2
Download all 13 files immediately.
- Step 3
Open Start Here, run the 7 Checks on your next earthwork request, then standardize the workflow across projects.
Trust and guarantee
Instant digital access
Practical working templates
Single-firm license, unlimited projects
7-day money-back guarantee
Try the toolkit for 7 days. If it does not fit how your firm works, email support@fieldwisestudio.com within 7 calendar days of purchase for a refund.
Not ready to buy? Start with the workflow.
Get the seven-step earthwork change order review as a one-page PDF. Free.
You will get the workflow now and occasional Fieldwise Studio updates. Unsubscribe anytime. Privacy
Frequently Asked Questions
Review Every Earthwork Request the Same Way
Set up an evidence-first review, then run it the same way on every project.
Get the Defense Toolkit ($297)7-day money-back guarantee • Single-firm license • Instant delivery